The Solution
The project consisted of a new suspended floor, architectural stairs and glazing, package lift system, cladding, joinery and full mechanical and electrical fit-out. The cladding was produced to a bespoke finish to suit the building’s historical features.
The Challenge
Construction was undertaken while the building was occupied, so we were mindful from concept stage about reducing disruption and ensuring that the logistics were carefully planned. Changes also had to be sympathetic to the existing fabric of the premises.
The Impact
The new retail unit is in keeping with the inimitable personality of the Barbican. A future-ready place that offers high quality and functionality while simultaneously celebrating and mirroring the unique character of its surroundings.